On the job details header metadata, add a tooltip to the duration text to indicate the started/ended values of the run.

I don't really have enough space here to add these directly to the header instead of the duration, but hopefully this is useful.

Test Plan

View a job with a run, verify that the tooltip shows the correct information.

Diff Detail

Repository
R1 dagster
Branch
dish-run-time
Lint
Lint Passed
Unit
No Test Coverage

Event Timeline

Thoughts on replacing the duration with the most recent start time in the header? I think the most recent start time is a more useful piece of information than the duration.